Fractal Vise First Time Assembly
Setting up the MetMo Fractal Vise for the first use
Attach a Fractal Vise to the Desktop Workstation
Recommended Torque Ratings

1. T25 screws - 5nm Max
2. Fractal Pins – 0.2 nm Max
3. Grub screws – Flush with sliding base
4. Dowel Pin grub screws (internal) – 3nm Max (these fix the dowels in place)
5. Lead screw grub screw – Screw down fully then undo half a turn to allow the lead screw to spin freely.
6. Base Plate screws – 3nm Max
More From MetMo
£59.99
£99.00
From £64.99





